C H A P T E R  3

Inspecting the Array Package

This chapter gives the general procedure for inspection and reviews the Sun StorEdge 3310 SCSI array package. Topics covered in this chapter are as follows:


3.1 Unpacking the Array

Follow these guidelines for unpacking the equipment.



caution icon

Caution - Always use two people to remove the unit from its container, to avoid personal injury or damage to the equipment during installation. A fully loaded unit weighs approximately 60 pounds.



1. Select a suitable area for unpacking.

2. Store all packing material and boxes for possible equipment returns.

3. Check the Contents Sheet in your product package. See Checking the Package Contents.

The Contents Sheet summarizes the standard contents for your product.

4. Compare the packing slip and the list of parts with the items you received.

If the list of parts on your packing slip does not match the items you received, or any items appear damaged, immediately notify your carrier agent and the supplier who prepared your shipment.

5. Carefully examine the cables provided in the package.

If any cable appears to be damaged, contact the Technical Service department for an immediate replacement.

6. Check the list of Customer-Provided Cables.

These are required to complete your installation.



caution icon

Caution - You must purchase or provide 160M-compliant SCSI cables for connecting the Sun StorEdge 3310 SCSI array to host servers.




3.2 Checking the Package Contents

It is important to inspect your Sun StorEdge 3310 SCSI array packages for standard items as well as purchased options before you begin installation. If any parts are missing or damaged, contact your sales representative immediately.

Quantity

Item

1

One or more of the following Sun StorEdge 3310 SCSI arrays:

  • Sun StorEdge 3310 SCSI array with single controller
  • Sun StorEdge 3310 SCSI array with dual controllers
  • Sun StorEdge 3310 Expansion Unit or JBOD (a group of disks, no controller)

1

  • Sun StorEdge 3310 SCSI Array Contents Sheet
  • To download and print the latest Sun StorEdge 3310 SCSI array release notes, go to:

http://www.sun.com/products-n-solutions/hardware/docs/Network_Storage_Solutions/Workgroup/3310

2

CDs in a CD set; one CD for software and one CD for user documentation

1

SCSI jumper cable, 1-foot (30cm), VHDCI-VHDCI (for bus setting)

1

SCSI jumper cable, 1.5-foot (45cm), VHDCI-VHDCI (if you ordered a JBOD or expansion unit)

1

Serial null modem cable

1 or 2

25-foot (7.5m), CAT5 Ethernet cable per controller in each array

1

Cable adapter, DB9-to-DB25

2

DC power cables if you ordered a DC-powered array

2

AC power cables if you ordered an AC-powered array (shipped separately as part of the country kit).

2

AC cord locks in a plastic bag if you ordered an AC-powered array

2

Front-bezel keys in a plastic bag, to secure the front bezel onto the chassis

Various

Purchased options. These options are ordered at the time of purchase and are integrated into or added to the unit prior to delivery.



3.3 1-Replaceable Units

Check that you received all field-replaceable units (FRUs) ordered with your Sun StorEdge 3310 SCSI array. For additional FRUs, consult your sales representative. For instructions on how to install or replace FRUS, review the following manuals located on the product website:


3.4 Customer-Provided Cables

Customers must provide the following cables.

To obtain qualified cables, consult your Sun sales representative.


3.5 Mounting Your Array in a Rack or Cabinet

Refer to Sun StorEdge 3000 Family Rack Installation Guide for instructions on how to install and prepare a rack or cabinet for mounting your array.


3.6 Converting a JBOD to a RAID Array

If you want to convert a JBOD to a RAID array, refer to the Sun StorEdge 3000 Family FRU Installation Guide.