Netra 440 Server Installation Guide
817-3882-11
Contents |
Contacting Sun Technical Support
Installation Site Requirements
AC Operating Power Limits and Ranges
Recommended Operating Environment
Sun Advanced Lights Out Manager
Sun Remote Services Net Connect Support
Installing Optional Components
3. Installing a Netra 440 Server Into a Rack
Hardmount in a 19-Inch 4-Post Rack
Sliding Rail Mount in a 19-Inch 4-Post Rack
Hardmount in a 600 mm 4-Post Rack
Hardmount in a 23-Inch 2-Post Rack
Hardmount in a 19-Inch 2-Post Rack
Connecting the Chassis Grounding Cable (DC Version)
Ethernet Ports (NET0 and NET1)
ALOM Serial Management Port (TTYA)
Assembling and Connecting the DC Input Power Cable
Connecting the AC Power Cables
5. Setting Up a System Console Device
Accessing the System Console Through a Terminal Server
Connecting the Server to a Terminal Server
Accessing the System Console Through a Terminal Server
Accessing the System Console Through an Alphanumeric Terminal
Accessing the System Console Through a TIP Connection
6. Powering On and Configuring the Server
Powering On Using the On/Standby Button
Powering Off the System Using the On/Standby Button
Software Configuration Worksheet
Configuring With the Server Details Registered as a Name Server
Configuring Without the Server Details Registered as a Name Server
Configuring a Standalone Server for the First Time
Clearing Your Configuration and Starting Again
Accessing Advanced Lights Out Manager (ALOM) Software
Taking Console Write Capability Away From Another User
D. Managing Network Interfaces
Attaching a Twisted-Pair Ethernet Cable
Configuring the Primary Network Interface
Configuring Additional Network Interfaces
Initiating a Reconfiguration Boot
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.