C H A P T E R 1 |
Site-Preparation Process |
The Cluster Platform 15K/9960 system has various physical and environmental requirements. Review the site preparation process flow diagram shown in FIGURE 1-1 as you begin to evaluate the needed requirements.
Copyright © 2002, Sun Microsystems, Inc. All rights reserved.