Figures

FIGURE 2-2small space Netra 10

FIGURE 2-5small space Shipping Plates 13

FIGURE 3-3small space DC Input Connector 23

FIGURE 3-4small space Strain Relief Housings 24

FIGURE 3-5small space Cage Clamp Operating Lever 24

FIGURE 3-6small space Power Connector on the DC Power Supply 24

FIGURE 3-7small space Stripping the Insulation From the Wire 25

FIGURE 3-8small space Opening the DC Connector Cage Clamp Using the Cage Clamp Operating Lever 26

FIGURE 3-10small space Inserting the Bottom Portion of the Strain Relief Housing 27

FIGURE 3-11small space Routing the Wires Out of the Bottom Portion of the Strain Relief Housing 28

FIGURE 3-15small space System Power-On (Front Panel, AC System Shown) 31

FIGURE 3-16small space System Power-off (Front Panel, DC System Shown) 33

FIGURE 4-2small space DB-25 Parallel Connector 36

FIGURE 4-3small space DB-25 Serial Connectors 38

FIGURE 4-4small space 68-Pin SCSI Connector 39

FIGURE 4-6small space RJ45 TPE Socket 42

FIGURE 4-7small space FC-AL Connector 43

FIGURE 4-8small space USB Connector 44

FIGURE 4-9small space DB-15 (Male) Alarms Service Port Connector 45

FIGURE 4-10small space RJ45 Lights Out Management Serial Connector 45

FIGURE 6-3small space PSU Status LEDs (Netra 56

FIGURE 6-4small space PSU Status LEDs (Netra 57

FIGURE 7-1small space System Prompt Flow Diagram 60

FIGURE 10-1small space The Location of the Lights Out Management Device 68

FIGURE 12-2small space Attaching the Antistatic Wrist Strap to the Front of the Chassis 106

FIGURE 12-3small space Front Fascia and Filter 108

FIGURE 13-1small space FC-AL Disk Drives 114