The Create Baseline: Single Baseline section appears.

On the top right the Cancel, Back, Finish buttons appear.

The Baseline Name field is empty.

In the Baseline Interval section, Snapshot Range is selected.

The Change Chart Time Period navigation tree is collapsed.

In the Select Time Period section, the Period Start Time option shows Mar 6 2007 7:00:22. It is not selected. The Period End Time option shows Mar 6 2007 8:00:31 PM PST. This option is selected.

A chart shows active sessions on the y-axis. The values range from 0 to 1.347. The x-axis shows hours of day, shown in 1-hour intervals, ranging from 10:00 p.m. to 8 p.m.

The Time Range option is not selected.

The Start Time is Mar 7 2007 at 8:20 p.m. The End Time is Mar 7 2007 at 8:30 p.m.

End of description.