Netra 240 Server Installation Guide
817-2698-12
Contents |
Standard Server Configurations
Sun Advanced Lights Out Manager
Sun Remote Services Net Connect Support
Installation Site Requirements
Recommended Operating Environment
Installing the Bezel Air Filter
Installing Optional Components
3. Mounting the Server Into a Rack
Hardmount in a 19-Inch 4-Post Rack
Sliding Rail Mount in a 19-Inch 4-Post Rack
Hardmount in a 600 mm 4-Post Rack
Hardmount in a 23-Inch 2-Post Rack
Hardmount in a 19-Inch 2-Post Rack
Connecting the Chassis Grounding Cable
5. Power Source Requirements and Connections
Operating Power Limits and Ranges
DC Supply and Ground Conductor Requirements
Overcurrent Protection Requirements
Assembling and Connecting the DC Input Power Cable
Assembling the DC Input Power Cable
Installing the Strain Relief Housings
Connecting the DC Input Power Cable to the Server
Connecting the AC Power Cables
6. Setting Up a System Console Device
Accessing the System Console Through a Terminal Server
Connecting the Server to a Terminal Server
Accessing the System Console Through a Terminal Server
Accessing the System Console Through an Alphanumeric Terminal
Accessing the System Console Through a TIP Connection
7. Powering On and Configuring the Server
Powering On Using the On/Standby Button
Powering Off the System Using the On/Standby Button
Software Configuration Worksheet
Configuring With the Server Details Registered as a Name Server
Configuring Without the Server Details Registered as a Name Server
Configuring a Standalone Server for the First Time
Clearing Your Configuration and Starting Again
Accessing Advanced Lights Out Manager (ALOM) Software
Taking Console Write Capability Away From Another User
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.