Sun Logo


Netra CT 820 Server Installation Guide

817-2641-12



Contents

Figures

Tables

Preface

1. Installation Overview

2. Installing the Chassis

Tools Required

Unpacking the System

Shipping Contents

Basic Configuration

Installing the System

Rackmounting the System

Providing Power

Connecting DC Power

3. Installing Additional Cards Into the Netra CT 820 Server

Antistatic Precautions

Installing Additional Cards in the Netra CT 820 Server

Ethernet Networking on the Netra CP2300 Board

Installing Rear Transition Cards

Installing Node Cards

4. Cabling the System

Connecting Cables to the Distributed Management Cards

Ports on the Distributed Management Card

Console Port

Ports on the Rear Transition Card for the Distributed Management Card

Console Ports 1A and 1B

Alarm Ports 1A and 1B

Ethernet Ports 1A and 1B

Connecting Cables to the Switching Fabric Boards

10/100 Mbit/sec Ethernet Ports (20-23)

1000 Mbit/sec Ethernet Ports (25 and 26)

Console Port

Connecting the Cables to the Netra CP2300 Boards

PMCs on the Netra CP2300 Board

PMC Connectors

Ports on the Rear Transition Card for the Netra CP2300 Board

PIM Connectors

USB Port

Serial Ports

Fast Ethernet Connectors

5. Powering the Server On and Off

Connecting a Terminal Console to the Server

Using an ASCII Terminal

Using a Solaris Workstation

Using a PC Laptop

Powering On the Server or Boards

Performing a Hardware Power-On

Performing a Software Power-On

Powering Off the Server

Performing a Hardware Power-Off

Performing a Software Power-Off

A. System Specifications

Electrical Specifications

Environmental Specifications

Glossary

Index