Netra CT 820 Server Installation Guide
817-2641-11
Contents |
3. Installing Additional Cards Into the Netra CT 820 Server
Installing Additional Cards in the Netra CT 820 Server
Ethernet Networking on the Netra CP2300 Board
Installing Rear Transition Cards
Connecting Cables to the Distributed Management Cards
Ports on the Distributed Management Card
Ports on the Rear Transition Card for the Distributed Management Card
Connecting Cables to the Switching Fabric Boards
Connecting the Cables to the Netra CP2300 Boards
PMCs on the Netra CP2300 Board
Ports on the Rear Transition Card for the Netra CP2300 Board
5. Powering the Server On and Off
Connecting a Terminal Console to the Server
Powering On the Server or Boards
Performing a Hardware Power-On
Performing a Software Power-On
Performing a Hardware Power-Off
Performing a Software Power-Off
Preparing for the Solaris Operating Environment Installation
Installing the Solaris Operating Environment on an IDE Disk Drive
To Install the Solaris Operating Environment on an IDE Disk Drive
Preparing Network Installations of the Solaris Operating Environment
To Create a Network Installation Image Using the Solaris 8 2/02 DVD
To Create a Network Installation Image Using the Solaris 8 2/02 CDs
To Create a Boot Server For Diskless Clients
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.