C H A P T E R  5

Site Planning Checklists

Prior to the Sun Fire 15K/12K systems installation, confirm that the following requirements have been met.


5.1 System Components


5.2 Miscellaneous


5.3 Environmental Requirements


5.4 Physical Specifications


5.5 Network Planning


5.6 Planning Your Access Route


5.7 Installation Schedule